The Impetus’ Infrastructure team transformed a potholed, poorly draining street into a smooth and safe roadway. 

The overall project encompassed removing 170,000-square-feet of the existing composite roadway and replacing it with an asphalt roadway.

To begin the reconstruction work, the team first removed 27,000-cubic-yards of excavation.  Next, over 4,500-linear-feet of new waterlines, 8,900-linear-feet of storm drainage, and

 

3,500-linear-feet of sanitary sewer was installed.  To rebuild the roadway, 12,000-tons of limestone and 14,000-cubic-yards of sand were installed and then topped with 7,500-tons of asphalt cement concrete paving and 3 miles of pavement striping. 

SIZE OF PROJECT

5,000 Feet

NUMBER OF STREETS

1

OWNER

LADOTD and City of New Orleans

ENGINEER

Design Engineering, Inc.

TYPE

Infrastructure, Self-Perform Water, Sewer, and Drainage, and Concrete Site Work

LOCATION

New Orleans, LA

INDUSTRY

Infrastructure, Self-Perform

STATUS

Completed in 2021